News archive

Factory-painted cladding
Why use time and energy on surface treatment of new cladding when we can do it for you?
Read more
First sawmill in Norway with X-ray sorting of timber
Every single log is used where it is best suited, resulting in less waste. This is the goal of Moelven Våler AS in Braskereidfoss when the sawmill becomes the first in Norway with X-ray sorting of timber.
Read more
How the world's tallest timber building withstands fire
Mjøstårnet will be the world's tallest timber building. But what if a fire breaks out?
Read more
Strong result in snowy quarter
The great interest in using wood for building provided Moelven with strong operating income in the first quarter, although the winter cooled some parts of the market.
Read more
Can build timber skyscraper taller than 150 metres
“With a wider building, it will be possible to build a timber building taller than 100 metres. 150 metres should also be possible. Possibly even taller.”
Read more
Building a world record
During the winter Olympics at Lillehammer Rune Abrahamsen found motivation to set world records using timber as a building material. 24 years later he is spearheading the timber structure in the world’s tallest pure timber building.
Read more
World-class engineering
Director Sverre Tiltnes of Bygg21 says that Mjøstårnet is world-class engineering.
Read more
Good result for Moelven
Moelven posted a NOK 420 million profit on the company's operations in 2017. This is an earnings improvement of NOK 125 million compared to the previous year
Read more